An expansive wrap around deck area with extensive detailing took place on this project. In this case, the ranch-sliders were removed to install the membrane over the base plates. The handrail was wooden and face fixed.
As home owners, we decided we wanted to stick with the same handrail. Being face fixed enabled…
This home had living quarters below. The owner wanted to modernise the deck with new waterproofing and a re-designed glass handrail. Homes near the seaside can have a higher maintenance level due to the natural elements and this house was no exception, receiving all day sun and sea air. Previously the deck had a liquid…
Removing the tiles from this deck was a preventative measure to avoid possible future leaking. The grout was loose and started to crack. Much research was done by the client and the final decision became easy after seeing the patterns and colours. Installing Duradek PVC Trafficable membrane added style to the final project outcome.
East…
Concrete decks need much preparation and extreme care for a smooth surface. Duradek membrane is installed similarly to that of a wooden substrate however the concrete surface preparation is different. No handrail was required with this project as the deck was under 1m in height. The membrane had full termination.
We as clients liked…
Homes near the seawater can have a higher maintenance level due to the natural elements. This home had living quarters below and to avoid top fixed post penetrations which can lead to water ingress from the moment of membrane penetration takes place, a new design was created for the handrail to be face fixed while…
This project originally had tiles with butynol underneath that had perished. The adhesive in the laps/seams had disintegrated, leaving the laps unsealed allowing for water ingress. The grout started to unsettle away from the tiles and when standing on the tiles after raining, trapped moisture would squish and rise through the unsettled grout edging.
We…